Hi friends,
I am using ABAQUS to model a O-Cell load test for deep pile foundation. I would like to applied the load which gradually increases with time (in second). But, if I apply the load step by step then it may take much time to input the data. I think we can use AMPLITUDE toolset in ABAQUS to define the incresing load (ex.), but I don't know how to apply the load by using AMPLITUDE toolset.
Example I have:
Time(sec) --- Load (kN)
1--- 100
15 ----500
30----1000
etc..
Can you please tell me how to define?
Recent comments