A problem met when using Abaqus CEL to deal with pile installation process.

cel

Just like the above picture shows, when I use the Abaqus CEL technology to simulate the pile installation process,  the progaram can not run through. The whole step time is 100 and it can only run to 65. The desired penetration depth is 500 mm, however it stops at about 300 mm, I don't know why. Waiting for someone who is familiar with this area wo solve my puzzles.

Many thanks beforehand.

 

Any information needed, you can just send e-mail to me and my e-mail adress is guowb2008@zju.edu.cn.