This paper presents use of contact simulation and *MODEL CHANGE features in Abaqus to simulate the construction process of the 23-degree skew Parkview Bridge for design verification and assessing durability of the structural system.
| Attachment | Size |
|---|---|
| Attanayake_WesternMichigan_final_2202012.pdf | 640.89 KB |